{1}
##LOC[OK]##
 
{1}
##LOC[OK]## ##LOC[Cancel]##
feature image
Worth Discovering
Aurora Colorado
MENU
  • Aurora Colorado
  • Home
  • Home
  • City Leaders Guiding Changes to Policing

    Read More
  • E-cycling Event Aug. 29 at Two Locations

    Read More
  • Aug. 26 Business Owner Town Hall on Minimum Wage Ordinance

    Read More
More News
Questions? Access Aurora  303.739.7000
  • Nextdoor icon
  • AuroraTV
  • Sign up for Emergency Alerts
COVID-19 information and resources More

Parker Quincy Road Study

City of Aurora version1 » Business Services » Planning » Projects, Plans & Studies » Transportation Planning » Parker Quincy Road Study
  • A-
  • A+

Parker Road/Quincy Avenue/Smoky Hill Road Intersection Improvement Study

The city of Aurora conducted this project to provide a comprehensive transportation study of the Parker Road and Smoky Hill Road intersections along Quincy Avenue. The study evaluated the existing and future operating conditions of the area intersections and identified low-cost system management and near- and long-term operational improvements. The study was completed September 2016. Scroll down to view the final study report.

 
 Parker Quincy Study Schedule
 Study Area

Study Area
The study area included Parker Road, from approximately one-half mile north of Quincy Avenue to one-half mile south of Quincy Avenue. The study area also included Quincy Avenue from west of Parker Road through the Chambers Road intersection, and included Smoky Hill Road from north of the Quincy Avenue intersection to south of the Tufts Place intersection.

The 2009 Parker Road Corridor Study recommended that a grade-separated interchange be implemented at the intersection of Parker Road and Quincy Avenue, in addition to widening Parker Road between Hampden Avenue and Quincy Avenue. There is no funding for this large-scale transportation improvement. The 2015-16 operational improvement study identified relatively low-cost improvements that can improve the transportation operations of the area surrounding the intersection with funding that may be obtained in the near term.


Study Goals

The objective of this operational improvement study was to work with area stakeholders to develop and analyze a range of improvements to reduce congestion and improve operational performance and safety of the Parker Road and Quincy Avenue intersection and the Quincy Avenue and Smoky Hill Road intersection and to identify low-cost system management and near- and long-term operational improvements.

Key elements of the Parker Road/Quincy Avenue/Smoky Hill Road Intersection Improvement Study included:

  • Perform operational analysis of existing conditions
  • Develop 2020 and 2040 traffic volume projections
  • Develop and analyze operational improvement alternatives
  • Perform an operational analysis of 2020 and 2040 traffic volume conditions
  • Conduct an evaluation of pedestrian and bicycle accessibility and roadway crossing treatments
  • Identify potential constraining elements, such as utilities, drainage infrastructure, and right-of-way
  • Screen alternatives to develop recommended improvements
  • Generate a conceptual cost estimate for the recommended improvements


 Parker Quincy Schedule Revised 1-18-16 Image
 Study Schedule
Schedule

This study began in August 2015, and documentation was completed in September 2016. 


Final Reports

Final Existing Conditions Summary - December 2015
Final Study Report


Public Meetings Held

Public Meeting #1: Oct. 20, 2015, Shalom Park Retirement Community
Study Goals and Key Elements
Alternatives Screening Process
LOS Descriptions
Existing Traffic Operations
Existing Traffic Volumes
Year 2020 Traffic Operations
Year 2020 Traffic Volumes
Year 2040 Traffic Operations
Year 2040 Traffic Volumes
Crash Summary (2012-2014)
Existing Roadway Conditions
Environmental Resources
Existing Multimodal Conditions
Pedestrian & Bicycle Travel Patterns
Public Meeting #1 Comment Sheet (Handout)
Meeting Overview (Handout)
Q&A (Handout)
Public Comments Summary

Public Meeting #2: March 3, 2016, Shalom Park - Beth Israel Nursing Home
Study Area
Study Goals
Study Schedule
Alternatives Screening Process
Level of Service Descriptions
Existing Traffic Volumes and Operations
Year 2020 Traffic Volumes and Operations
Year 2040 Traffic Volumes and Operations
Existing Multimodal Conditions
Crash Summary
Initial Alternatives
Potential Improvements Outside Project Goals
Initial Level 1 Screening Matrix
Comparative Screening Alternatives
Comparative Level 2 Screening Matrix
Comparative Level 2 Screening Summary
Action Alternatives Being Carried Forward
Potential Bicyclist Pedestrian Treatments
Project Implementation Process
Meeting Overview Handout
Public Meeting #2 Comment Sheet Handout
Public Meeting #2 Q&A Handout
Public Meeting #2 Public Comment Summary

Public Meeting #3: June 23, 2016, Shalom Park - Beth Israel Nursing Home
Study Area
Study Goals
Study Schedule
Alternatives Screening Process
Study Recommendations
Recommended Parker Quincy Intersection Improvements
Recommended Smoky Hill Quincy Intersection Improvements
Evaluation of Recommendations
Project Implementation Process
Meeting Overview Handout
Public Meeting #3 Comment Sheet Handout
Public Meeting #3 Public Comment Summary

Contact the Project Team


The city of Aurora values concerns and comments of citizens and businesses in the area. Please e
mail or call the project contact if you have any thoughts to share. 

Project Contact
Steven Gardner, City of Aurora Engineering Supervisor
303.739.7852  |  sgardner
@auroragov.org
​

Search
Aurora Colorado
City of Aurora, Colorado15151 E. Alameda Parkway, Aurora, CO 80012 - Phone: 303.739.7000 - Contact Us
Notice of Non-Discrimination | Privacy Policy | Work for the city of Aurora
City of Aurora, ColoradoAll Rights Reserved | Powered by CivicLive | © 2018 West Corporation