Inspections accepted Monday–Friday, 8 a.m. to 4 p.m.
303-739-7420 for next-day inspection
Inspection request line: 303-739-7416
Fax inspection to: 303-739-7412
The Building Codes Division requires inspections for all permits from rough to final. The type of work is what will determine what type of inspections you will need. A representative of the Building Code Division will assist you through the inspection process.
|
|
|
Fax Inspections Transmittal form
|
|
|
Fax Inspections Transmittal form (Fill in Word doc)
|
(Please note forms are in Adobe format. After downloading, select the back arrow to return to this site.)
|
Reminder to HVAC and Plumbing contractors for immediate inspection:
The City of Aurora Building Codes Division has taken a proactive approach with the inspection process for replacement water heaters and furnaces. A licensed HVAC contractor or Plumbing Contractor can contact the Building Codes Division and request the same day inspection when it involves the coordination of both the contractor and homeowner to be present.
Because we understand that an emergency repair may precede the opportunity for a contractor to obtain a permit we will still perform the same day inspection. Here’s how it works. Call (303) 739-7420 to request the inspection. We will locate an inspector in your area and dispatch them to perform the inspection. To be compliant with the 2006 International Residential Code (Section R1052.2.1) the contractor must obtain a permit within the next working business day.
|
|
|
INSPECTION REQUESTS ONLY: Email inspection requests to: inspections@auroragov.org. Cut off for inspections 4:00 P.M.
|
Inspection types listed in alphabetical order
|
Type of Inspection
|
Miscellaneous Information
|
Alarm system
|
|
Electrical rough
|
|
Electrical rough alarm
|
|
Electrical rough & Service
|
|
Electrical final
|
|
Exit Sign/Emergency Lights
|
|
Fire Extinguisher
|
|
Fire Sprinkler
|
|
Fire Lanes
|
|
Frame rough (After all “rough” inspections are completed you can then call for)
|
|
|
|
|
|
|
|
|
|
|
|
|
Fuel tank installation
|
|
Frame final
|
|
Fuel Tank-Lines
|
|
Heat rough
|
|
Heat rough & gas pipe
|
|
Heat final
|
|
Hood System
|
|
Knox Box
|
|
Plumbing rough
|
|
Plumbing rough & Ground iron
|
|
Plumbing final
|
|
Re-roof final
|
|
Sprinkler system
|
|
NOTE: After all “rough” inspections have been completed then you can call for “final” inspections. They can be called in any order or all at once.
|
The type of permit you have will determine what inspections you will need.
|
To call in an inspection we will need:
- Permit Number
- Address and unit number if applicable
- Type of inspection you are requiring
- Phone number
|
Return to main page of Building Code Division
|